Software comparison

JobTread vs Buildertrend Comes Down to Head Count and Job Type

JobTread publishes its price and charges for each office login. Buildertrend quotes each company and includes unlimited users. Here is how the JobTread vs Buildertrend choice plays out, plus a section for post-frame builders.

An owner and office manager weigh two binders on a tailgate beside a finished 40x60 post-frame shop at golden hour

The short answer

Most owners comparing JobTread vs Buildertrend are deciding two things: how to pay for software, and how much of the homeowner experience it should run.

JobTread publishes its price: $199 a month with one internal user included, then $20 for each additional office user, every feature included and no contract. It suits a lean team that wants job costing at the center, priced before the first sales call.

Buildertrend quotes each company after a questionnaire and a call, and the quote covers unlimited users. It says it was built for builders running five or more projects a year or complex, multi-phase builds; its site leads with job costing, WIP reporting and a client portal that carries homeowner selections.

Both are broad platforms built around home builders, remodelers and commercial or specialty contractors. If you sell post-frame or metal buildings, read that section further down first.

JobTread vs Buildertrend, side by side

JobTreadBuildertrend
Price on the website$199/month, one internal user includedNot published; custom quote after a questionnaire and a call
How users are chargedPer internal user: $20 each for users 2-10, $15 for 11-20, $10 for 21-30, $5 after that (monthly plan)Unlimited users and projects included
Terms20% off annual; no contract or setup fee; 30-day money-back on monthly; no free trial10% off an annual plan paid upfront (offer running in September 2026)
Sales sideCRM, lead management, bid requests, contracts and e-signaturesLead capture, proposals, email drips, bid management, digital contracts
TakeoffUpload and scale plans; parameters and formulas turn measurements into quantitiesUpload plans; area, linear and count tools; assemblies sync quantities into estimates
MoneyCost catalog, budgets, change orders, job costing, POs, AIA payment applications, sub and vendor billingEstimates, budgets, job costing, forecasting, WIP reporting, bills and POs, invoicing
Homeowner sidePortal, selections and allowances, financing, online payments, warrantyPortal with selections and allowances, AI-written weekly Client Updates, online payments
FieldScheduling, daily logs, time tracking, photosSchedules, daily logs, time clock, change orders, punch lists
AccountingQuickBooks OnlineQuickBooks or Xero
Built-in AIBudgets, formulas and formsClient Updates and Bill Capture
Size13,000+ construction businesses20,000+ builders; in business since 2006

From each vendor's website, September 2026. Confirm anything decisive on the demo.

Run the seat math with your own office list

JobTread's price moves with office head count; Buildertrend's does not. So count who would log in to manage jobs (owner, office, estimator, reps, project manager), not the crews.

On JobTread's published monthly plan:

  • 3 internal users (owner, office, one rep): $199 + 2 × $20 = $239 a month
  • 6 internal users (add two reps and a PM): $199 + 5 × $20 = $299 a month
  • 10 internal users: $199 + 9 × $20 = $379 a month
  • 20 internal users: $379 + 10 × $15 = $529 a month

The annual plan takes 20% off. Customers, subs and vendors are free, and so are field crew who only upload photos, log daily notes, view the schedule or check off tasks; if your crews will clock hours, ask how they are counted.

Buildertrend's pricing page books a call instead of showing a number, and third-party figures vary widely, so plan around your own quote. Find it on the ladder above, monthly against monthly: that is the head count where the two cost the same. More detail: what Buildertrend pricing includes.

Where each one is strongest

JobTread

Fits: a builder or remodeler with a small office who wants budgets and job costing at the center, and the price in writing before talking to sales.

Strengths: a public price list, every feature included, free implementation and training with a customer success manager, and a money side that runs from takeoff and cost catalog through job costing and vendor billing.

Consider: the bill grows with every office login, and there is no free trial; monthly plans carry a 30-day money-back guarantee instead.

Buildertrend

Fits: a builder running five or more projects a year or complex multi-phase builds, with homeowners who expect a polished portal and a team big enough that per-user pricing would add up.

Strengths: two decades in construction software, unlimited users, portal selections against allowances and deadlines, AI-written weekly Client Updates, plan takeoff, WIP reporting, and an onboarding manager who runs your first job with you.

Consider: the price comes on a call, not a web page, and a small shop running a few simple jobs may pay for depth it will not use. Its Builder Fit Quiz exists for that question.

If you sell post-frame buildings: what neither was built around

Neither names post-frame, pole barn or metal building companies among its audiences, or lists a building designer. Both offer takeoff: upload a plan, measure it, and formulas or assemblies turn the measurements into quantities. That is focus, not a flaw. A post-frame sale runs differently:

There is no plan to measure yet

A pole barn lead arrives as a size and a use: 40x60, 14-foot walls, room for a combine. Takeoff measures a drawing; on a post-frame sale the drawing is what the rep has to produce before he can price anything.

Every change re-counts the frame

Take that 40x60 from a 14-foot to a 16-foot eave and every post gets longer, another row of girts goes around and every wall sheet re-cuts. A measured plan follows only if someone redraws it, or wrote formulas that already know post-frame framing.

The customer is buying a shape

He pictures the 12-foot lean-to, the gable-end overhead door and the wainscot color. A line reading 'lean-to, 12 x 60' does not.

Leads come from three counties at once

Calculator and ad leads land at all hours. Whoever covers that county should call within minutes, not after lunch.

Where Leads2Build fits beside JobTread and Buildertrend

Leads2Build is built only for post-frame, pole barn, barndominium and metal building companies. If that is not your work, pick one of the two above.

What mattersLeads2BuildJobTread and Buildertrend
Built forPost-frame, pole barn, barndominium and metal building companies. Not remodelers, general contractors or stick-frame tract builders.Home builders, remodelers, commercial builders and specialty trades.
Material quantitiesDrag the building in 3D and the material list is counted off the model: posts, trusses, girts, purlins, steel, trim. No plan to measure, no formulas to write.Takeoff on uploaded plans in both; formulas (JobTread) or assemblies (Buildertrend) turn measurements into quantities for estimates and POs.
Homeowner selectionsWindow, door and garage door colors, picked on the quote until he approves. No interior-finish selections module.A real strength of both: selections and allowances in the portal, with deadlines and sign-off in Buildertrend.
The quoteA page on your domain with their building in 3D, the payment schedule and Approve & Sign at the bottom.Proposals and contracts with e-signatures, and a portal with invoices and online payments.
Job costingEstimate against actual labor, receipts and material orders while the job is open.Deep in both: budgets, job costing, POs and bills; forecasting and WIP reporting in Buildertrend.
LeadsRouted on arrival to the rep covering that county or ZIP; a missed call creates a task.CRM and lead management in both, with email drips in Buildertrend.

JobTread and Buildertrend capabilities as listed on their own websites, as of September 2026. Both are strong at the work they were built for; this table is about fit, not a scorecard.

The building writes its own material list

In Leads2Build the estimate starts as a building. You drag the width, length, eave and pitch, hang a lean-to off a sidewall, and the material list is counted off that model in six sections: framing, sheathing, trim, doors and windows, foundation and fasteners. Lumber is packed into the stock lengths a yard sells, and every line says where its number came from.

Change the eave and the list follows; nobody re-keys a quantity. Already quoting in SmartBuild? Keep pulling jobs from it, or start them in the 3D designer; switching does not delete a SmartBuild job.

Materials
Framing
6x6 solid-sawn post (UC4B treated) (18′ stock)
378 LF consumed · 21×18′ · 0 LF waste · incl. 4′ embedment — UC4B ground-contact treatment is a hard spec for embedded posts
21 pcs
6x6 jamb post (UC4B treated) (18′ stock)
36 LF consumed · 2×18′ · 0 LF waste · 2 laminated 2-ply (span > 9′) — full height, header load path
2 pcs
Nailed jamb (2-ply 2x6 / 4x6) (14′ stock)
134 LF consumed · 10×14′ · 6 LF waste · 8 doubled 2x6 + 2 4x6 — bearing on the splash plank, tied to the header. No embedment, no ground-contact treatment.
10 pcs
2x6 cripple (above headers) (8′ stock)
235.5 LF consumed · 30×8′ · 4.5 LF waste
30 pcs
2x8 door jamb + head jamb (overhead doors) (14′ stock)
39.6 LF consumed · 3×14′ · 2.4 LF waste
3 pcs
2x10 spring anchor pad (SYP #2 or better — NOT SPF) (8′ stock)
2 LF consumed · 1×8′ · 6 LF waste · lagged, never nailed — 4 × 3/8″ × 4″ lags, one near each corner
1 pcs
2x6 wall girt (cut-to-stock)
1240.8 LF consumed · 38×10′ + 116×8′ · 67.2 LF waste
154 pcs
2x8 skirt board (treated) (cut-to-stock)
180.9 LF consumed · 6×10′ + 17×8′ · 15.1 LF waste
23 pcs
2x6 eave strut (cut-to-stock)
200.5 LF consumed · 8×10′ + 16×8′ · 7.5 LF waste
24 pcs
2x4 roof purlin (cut-to-stock)
1447.7 LF consumed · 72×20′ + 24×8′ · 184.3 LF waste
96 pcs
1-ply 2x8 opening header (8′ stock)
22.2 LF consumed · 5×8′ · 17.8 LF waste
5 pcs
2-ply 2x12 opening header (16′ stock)
31.7 LF consumed · 2×16′ · 0.3 LF waste
2 pcs
2x6 window sill (8′ stock)
20.4 LF consumed · 4×8′ · 11.6 LF waste
4 pcs
Truss C40P4 (40′ span, 4/12)
spec-string per SmartBuild convention (C{span}P{pitch}); 4′ o.c. — 2 gable + 14 common · double-Fink (WW) webs, plated both faces (ANSI/TPI 1)
16 pcs
2-ply SYP 2x12 truss carrier (cut-to-stock)
240 LF consumed · 12×16′ + 4×12′ · 0 LF waste · 2-ply, both sidewalls — trusses at 4′ o.c. land between posts at 8′, so they bear on a carrier rather than on the post tops
16 pcs
2x4 bottom-chord bracing (16′ stock)
336 LF consumed · 21×16′ · 0 LF waste · {floor sq ft} × 0.00875 over 2400 sq ft — shop rule, not an engineered layout
21 pcs
2x4 miscellaneous bracing (20′ stock)
378 LF consumed · 21×20′ · 42 LF waste · {floor sq ft} × 0.00875 over 2400 sq ft — shop rule
21 pcs
2x4 X-bracing (20′ stock)
162 LF consumed · 9×20′ · 18 LF waste · {floor sq ft} × 0.0035 — only fires at or above 578 sq ft, as the shop rule does
9 pcs
2x6 corner bracing (20′ stock)
400 LF consumed · 20×20′ · 0 LF waste · flat 20 pieces — the shop's standing corner-bracing allowance
20 pcs
2x6 eave sub-fascia (cut-to-stock)
123.9 LF consumed · 6×16′ + 2×14′ · 0.1 LF waste · carries the eave fascia and the soffit's outer edge
8 pcs
2x6 rake sub-fascia (cut-to-stock)
92.2 LF consumed · 4×16′ + 4×8′ · 3.8 LF waste · carries the rake fascia at the gable overhang
8 pcs
Sheathing
Ribbed steel (exposed fastener) roof panel, 22.1′ length
2 rectangle face(s) @ 36″ coverage · 2745 sq ft (MBCI MasterRib (36″ coverage, ¾″ ribs @ 9″))
42 panels
Roof underlayment / condensation barrier
2745 sq ft + 10% lap
3,020 sqft
Wall steel panel, 11′ length
1851 sq ft net of openings @ 3′ coverage
61 panels
Wall steel panel, 7.4′ length
119 sq ft net of openings @ 3′ coverage
8 panels
Wall steel panel, 7.2′ length
22 sq ft net of openings @ 3′ coverage
1 panels
Wall steel panel, 1.9′ length
27 sq ft net of openings @ 3′ coverage
5 panels
Wall steel panel, 0.6′ length
9 sq ft net of openings @ 3′ coverage
8 panels
Wainscot panel, 3′ height
553 sq ft
69 panels
Wainscot panel, 0.1′ height
1 sq ft
6 panels
Gable-end wall steel (cut to rake)
267 sq ft of gable endwall infill — not a rectangle
27 panels
House wrap — 10′ roll (wall)
2295 sq ft of wall ÷ 211 sq ft per roll (empirical coverage)
11 ea
House wrap — 10′ roll (roof)
2745 sq ft of roof ÷ 211 sq ft per roll (empirical coverage)
14 ea
Trim
Ridge cap
62.1 LF
Rake trim
92.2 LF
Eave trim
123.9 LF
Corner trim
55.9 LF
Door/window trim
127.4 LF
Eave fascia — 5½″ steel fascia/post trim
covers the sub-fascia; separate from the eave drip edge, which both exist on a finished eave
123.9 LF
Rake fascia — 5½″ steel fascia/post trim
the gable-end equivalent of the eave fascia
92.2 LF
Vented aluminium soffit (12″)
123.8 LF of eave soffit as drawn — rake soffit is not modelled yet and is NOT included
123.8 LF
Inside/outside closure strip
matches every eave run of exposed-fastener steel
123.9 LF
Doors & Windows
Garage Door 14′ × 12′
1 ea
Walk-in Door 3′ × 6′-8″
1 ea
Window 4′ × 3′
4 ea
Fasteners
Truss plate (gang-nail, 20 ga galvanized)
pressed into both faces at each truss joint — the connection, not overlapping wood
384 ea
Truss/rafter-to-post uplift tie (H2.5A-class, 18 ga galvanized)
one per truss bearing per post line — uplift path from roof to column
32 ea
1½″ HH panel screw (color-matched)
{sf}×1.8 over 5594 sq ft — platform default; calibrate per builder
10,069 ea
Foundation
Concrete, 18″ dia × 4′ post holes
23 holes — uplift anchorage required on every embedded post
6 yd3
Footing pads, 18″ dia × 6″ concrete
bear below the frost line on undisturbed soil — 2000 psf presumptive bearing; precast "cookie" or poured in the hole
23 ea
Uplift restraint — full-depth concrete collar (as drawn)
the poured backfill above is the restraint; treated blocks bolted to the embedded face are the soil-backfill alternative
23 ea

Design aid, not engineering — this is a purchase-vs-consumed takeoff from the same members the model draws. Stock lengths are yard lengths (no 60′ 2x4s). Factory trusses stay factory trusses. Not a substitute for a licensed design professional, a stamped truss package, or your local building department.

The material list, counted off the building that was drawn. Real screen · sample data.

Keep reading

LEAD · QUOTE · SIGN · INVOICE · BUILD

Walk a 40x60 from lead
to signed agreement

One record carries the sale: the lead routed to a rep, the building drawn and counted, the quote your customer approves, the draws. If you build remodels or stick-frame homes, JobTread or Buildertrend will serve you better.

leads2build.com
A post-frame barndominium at dusk, warm light in every window
The great room of a finished barndominium — exposed timber trusses, a stone fireplace and a wall of windows
Leads2BuildBUILDER OPERATING SYSTEM
A finished post-frame shop with charcoal steel siding and two overhead doors
Leads2BuildBUILDER OPERATING SYSTEM

Questions builders ask

How much does Buildertrend cost per month?

Buildertrend does not publish a price. Its pricing page asks a few questions and books a call to walk through a custom quote that includes unlimited users and projects; in September 2026 it offered 10% off annual plans paid upfront. Third-party figures vary widely, so plan around your own quote.

Is JobTread a good service?

For a small or mid-sized builder who wants job costing at the center, it is a strong option: every feature is included, the price is public, and implementation and training come free with a customer success manager. There is no free trial, but monthly plans carry a 30-day money-back guarantee.

Is Buildertrend worth it?

It depends on volume and team size. Buildertrend says it was built for builders running five or more projects a year or complex multi-phase builds, and unlimited users favor bigger teams. A two-person office running a handful of simple jobs may use a fraction of it.

Who are Buildertrend's competitors?

Buildertrend's own site publishes head-to-head pages against JobTread, CoConstruct, Houzz Pro, Procore, Contractor Foreman, BuildBook, Buildern and CompanyCam, a fair map of the field it sees. Post-frame and metal building companies often run an office system beside a trade design tool such as SmartBuild, which Leads2Build connects to rather than replaces.

Which is better for a post-frame or pole barn builder?

Either can run the office side of a post-frame company: leads, contracts, schedules, invoices and QuickBooks. Both offer takeoff on uploaded plans, but neither lists a building designer, so someone still has to draw the building first. Leads2Build is built for that trade: the estimate comes off a 3D model, and it can keep pulling jobs from SmartBuild.

30 minutes with Keith · exclusively post-frame & barndominium

Bring one real job.
We’ll walk it lead to paid.

Keith Lemay, the founder, takes this call himself. You show how a job moves through your business today — the call, the quote, the contract, the build, the money. He shows you the same job in Leads2Build. We work exclusively with post-frame and barndominium builders, so none of it is generic.

  • Pick a time — it goes straight onto Keith’s calendar.
  • The confirmation comes by email, with a link to move it if you need to.
  • Bring a job you’ve quoted lately. That’s the one worth walking through.
Keith LemayFounder, Leads2Build

Keith's next open times

The confirmation comes by email.