Construction Agreement
Construction Agreement
Review the agreement, then sign at the bottom. Use Print / Save PDF at the top to download a copy anytime.
Leads2Build Construction
Project Agreement · Effective August 26, 2026
Leads2Build Construction — Construction Agreement
This Agreement is entered into on August 26, 2026 between Marla Zimmerman (“Client”) and Leads2Build Construction (“Builder”).
Project Address: 4180 Sawmill Road, Ashland, MO 65010
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MECHANIC’S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR “LIEN WAIVERS” FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT.
In the event payment is not made when due, if the default is not cured within 10 days of the due date, then the payment shall bear interest at the rate of 10% per annum from the payment due date until paid.
Part 2 — Client Waiver and Agreement
By applying your initials to each section, you acknowledge that you have read, understood, and accepted the related terms.
1. Materials
We use high-quality materials; however, natural characteristics of wood and concrete may include splits, knots, cracks, warping, mold, or discoloration. These are normal and do not indicate defects. Metal trim, siding, and roofing are handled manually and may show scratches, dings, oil-canning, cutting marks or gaps.
Initialed:
2. Site Preparation
The project site must be level within two (2) inches unless otherwise agreed upon in writing. All obstructions must be removed within twenty (20) feet of all sides of the new structure before construction begins.
Initial:Tap to initial
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Scroll — 8 steps
Where it starts
They approve on the quote itself
The approve button rides along the bottom of the quote while they read it, with the total beside it: ready to approve? $128,400. One tap and the job exists. Nobody retypes the building, the price or the schedule into anything. The yes happens while the customer is excited, not three days later when the doubts have crept in.
The week between “yes” and a signed agreement is where deals go cold.
The same link asks for what the contract needs: legal name and date of birth, mailing address, and where the building is going, with the mailing address copied across in one tap. Anything already known is filled in for her to check. Marla types her own name, so it's spelled the way she spells it, and it lands on the right job. Customers like doing it themselves, and the office never re-keys a thing.
A details form emailed separately gets filled in on half the jobs and re-keyed by the office on the rest.
Thanks for approving your estimate. We need a bit of information to draft your contract. Anything we already know is pre-filled — please correct anything wrong.
Identity
Legal name + date of birth
Mailing Address
Legal correspondence address (separate from delivery)
Property Info
Build site address + ownership status
Where the building will go.
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Give a line an allowance and the customer makes the pick on their own page, with what each option does to the price beside it. Renee Hostetler's flooring allowance is $8,000: the vinyl and carpet as quoted is included, the Shaw LVP she chose is $1,600 over, the white oak would have been $4,600 over — and her builder confirms the pick. Her lighting pick came in $300 under, a credit, already approved; the kitchen cabinets are hers to choose by October 20. A pick that changes the price becomes a change order for the difference, signed like any other. The customer feels in control of her own building, and nobody gets a surprise on the final bill.
“We'll sort the fixtures out later” is how a fixed price stops being fixed.
The moment the details come in, the agreement is drafted from what's already agreed: the same building, the same price, the same payment schedule, the details Marla just typed. You read it beside what she submitted, change anything before it goes, counter-sign, and send it by email or text. The office stops dreading contract day, and the price never drifts from the quote.
A contract rebuilt by hand from an estimate is where the price and the scope quietly drift apart.
# Leads2Build Construction — Construction Agreement
This Agreement is entered into on **{{date.today}}** between
**{{customer.legal_name}}** ("Client") and **{{builder.company_name}}** ("Builder").
**Project Address:** {{project.address}}
---
## Part 1 — Estimate & Specifications
{{estimate.line_items_table}}
**Total:** {{estimate.total}}
### Payment Schedule
{{estimate.payment_schedule}}
Edits here apply only to this customer’s contract. Markdown is supported — switch to Preview to see the rendered result.
Open customer’s contract pageCopy linkNotify byEmailTextSend ContractCancel
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat four
Your own wording, with the blanks filled from the job
The words are yours. Start from a template in the library or your own agreement — a starting point, not legal advice — and mark the blanks: the name off their details form, the build site, the approved price, your stages for this job, the lien notice for that state, today's date. Mark it reviewed, and any change to the body clears the mark. We don't build software for plumbers or remodelers, so the blanks are a post-frame job's blanks. You sign every contract knowing exactly what it says.
A generic contract downloaded once and edited per job is a different contract every time.
1Contract TemplateMarkdown body with {{tokens}} that render at signing time. Saving creates a new version; previously-signed contracts keep their frozen copy.Browse template library
This template is a starting point, not legal advice. Construction contracts vary by state. Have a licensed attorney in your jurisdiction review the body before using it with customers.
Template
Construction Agreement — Waiver + Warranty▾
Body
# Project Agreement
**Effective Date:** {{date.today}}
**Client:** {{customer.legal_name}}
**Build Site:** {{project.address_inline}}
### 1. Scope of Work
The Company will furnish the labor, materials and
equipment to construct the building described above…
✓Default for new contractsv1Not reviewed
Marking a template reviewed by counsel is an auditable record. Saving any body change resets it, so an edit made after review forces a re-review rather than inheriting the old sign-off.
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
The agreement names the governing law from where the building is going up, and where statutory wording has been written for that state, it goes in. Where it hasn't, it says so plainly and names the state and its lien rights generally — and you can send the notice your attorney uses to have it added. A builder working across state lines sleeps better.
A contract that names the wrong state is a contract you find out about when it matters most.
Taken from the build-site address on their intake form — not from where your office is.
Build site state
§ Governing law & lien notice · Missouri
Missouri Notice. Failure of Contractor/Supplier to pay those supplying labor or materials may result in mechanic's liens under Missouri law. Client may request lien waivers.
Statutory wording written for this state.
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Initialled section by section, signed on the phone
Marla draws her initials once, then taps to initial each section as she reads it — two of thirteen done so far — and signs at the bottom with her finger. No printer, no scanner, no “can you send it in a format I can sign”. Initialling as she reads means she actually reads it, which means fewer arguments later.
Every step between reading the contract and signing it is a chance to put it down and not pick it up.
You counter-sign in one click, and the executed agreement carries both signatures with the dates they were made — Marla on the 20th, your side on the 21st. It's filed on the job, where anyone who needs it can print it. The customer gets a proper signed document, and you know where it is the day you need it.
A signed copy in somebody's email is a signed copy you'll be searching for the day you need it.
From yes to signed in one sitting: they approve on the quote, fill in their own details, and sign a contract written from the job — with their selections settled up front. Twenty minutes, on one of your real structures — and the link we build is yours to keep whether or not you go any further.
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MECHANIC’S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR “LIEN WAIVERS” FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT.
In the event payment is not made when due, if the default is not cured within 10 days of the due date, then the payment shall bear interest at the rate of 10% per annum from the payment due date until paid.
Part 2 — Client Waiver and Agreement
By applying your initials to each section, you acknowledge that you have read, understood, and accepted the related terms.
1. Materials
We use high-quality materials; however, natural characteristics of wood and concrete may include splits, knots, cracks, warping, mold, or discoloration. These are normal and do not indicate defects. Metal trim, siding, and roofing are handled manually and may show scratches, dings, oil-canning, cutting marks or gaps.
Initialed:
2. Site Preparation
The project site must be level within two (2) inches unless otherwise agreed upon in writing. All obstructions must be removed within twenty (20) feet of all sides of the new structure before construction begins.