A stage list — Down, Delivery, Final by default — where each stage has a name and a percentage, with the dollar figure computed live from the customer total. The schedule rides into the customer's document and is shared by both estimating engines.
Also called: deposit and draws · payment terms · 30/60/10 · draw schedule · payment plan · 30 percent up front · supplier instalments · what's due next · progress payments · deposit delivery final · payment stages · instalments
- 1Type a percentage on any stage; it pins, and the last unpinned stage absorbs the remainder so the list always sums to 100.
- 2A pinned stage never moves again, and the maximum you can type is bounded by the other pinned stages.
- 3The header shows 'Totals 100%' in green or the shortfall in red.
- 4Stages can be added and removed; the schedule saves with the estimate and ships in the snapshot.
Payment terms were part of the conversation and none of the document, so the deposit was agreed verbally and argued about later, usually once work had already started. The deposit and draw percentages now sit on the estimate with their dollar amounts shown against the customer total, and they have to add to 100% before it can go out. Typing the one number you care about — a third down — rebalances the rest, so nobody hand-balances a schedule and nobody sends one that doesn't add up.
- Payment terms living outside the quote
- Schedules that don't sum to the contract value