Electrical, plumbing and mechanical views, from the floor plan

Electrical, Plumbing and Mechanical views beside Shell and Frame: every circuit from the panel, every drain, vent and water line sized and under the slab, the ducts in the attic — and P1, P2 and M2 sheets in the plan set to hand your trades.

The operating system built exclusively for post-frame and barndominium builders.

Part of The Design Studio
The short answer

When should a barndominium's plumbing be laid out?

Before the slab is poured — the drains, the building drain's exit and the water service run under it. Our floor plan draws every drain sized from its fixture units at ¼″ per foot, the vents, cleanouts, supply and the utility trenches, and prints a P1 plumbing plan and P2 riser diagram to hand your plumber, who still routes it on site.

Why it works
What it is

The Layers menu gets Electrical, Plumbing and Mechanical. The drywall comes off and the studs show. Electrical: every circuit drawn in its own colour from the panel to its last box — up the panel wall, across the ceiling framing, down to the box, box to box through bored studs — switch legs and 3-way travellers, island boxes up through the slab, never up through a window or a door. The panel shows its working space (NEC 110.26); outside are the meter, the service and the ground rods; a legend lists each circuit with its breaker and wire, and the load calculation's service size. An independent check walks every wall and confirms no point is more than 6′ from a receptacle (NEC 210.52(A)) and that the required 20 A and dedicated circuits exist. Plumbing: every drain under the slab sized from the fixture units and laid at ¼″ per foot to the building drain and out to the sewer, vents up the walls and out through the roof, cleanouts, hot and cold PEX from a manifold beside the water heater, the T&P line, the water service below frost and the sewer trench. It flags what a plumber would mark up: trap arms too long, a 2″ vent up a 2x4 wall, hot runs over 50′. Mechanical: the air handler and condenser, supply trunks and a branch to every room, the return, bath fans and the range hood ducted out, and the dryer duct with its length check. The plan set gets P1 Plumbing plan, P2 DWV riser diagram and M2 Duct & gas layout, also in the trade-link packages. It is design intent to hand your electrician, plumber and HVAC contractor: they route it on site and size the equipment (airflow here is a stated rule of thumb until their Manual J). Built exclusively for post-frame and barndominium builders.

Also called: electrical layout 3d · circuit layout · panel schedule · receptacle spacing · plumbing layout · DWV riser diagram · under slab plumbing · vent stack · PEX manifold · HVAC duct layout · mechanical plan · plumbing plan sheet · barndominium plumbing · barndominium electrical

See it, piece by piece
01

Every circuit, from the panel

The Electrical view takes the drywall off and draws each circuit in its own colour from the panel to its last box — across the ceiling framing, down to the box, box to box through bored studs — never up through a window or a door. The legend lists each circuit, its breaker and its wire, and the service size from the load calculation.

The Electrical view: drywall off, every circuit drawn in its own colour from the panel through bored studs, with a legend of circuits, breakers and wire
The Electrical view with its legend. Real screen · sample data.
Without it

Outlets sat on the walls with nothing showing what fed them.

Why we built it

Every outlet is visibly on a circuit.

Sound familiar?“barndominium plumbing layout”
02

The panel and its working space

The panel shows its working space (NEC 110.26); outside are the meter, the service and the ground rods. An independent check walks every wall and confirms no point more than 6′ from a receptacle (NEC 210.52(A)).

The panel with its working space, the cable runs leaving it up the wall
The panel, the runs leaving it up the wall. Real screen · sample data.
Without it

Receptacle spacing was eyeballed.

Why we built it

The spacing is checked, not assumed.

Sound familiar?“under slab plumbing plan”
03

Drains, vents and water, sized

The Plumbing view draws every drain sized from its fixture units, the vents tied in the attic and out through the roof, cleanouts, and hot and cold PEX from a manifold to each fixture. The legend says what to check: long hot runs, a wet wall that needs 2x6 or a strap.

The Plumbing view: drains, vents to the roof and hot and cold PEX to every fixture, with the legend and what to check
The Plumbing view with what to check. Real screen · sample data.
Without it

A 2″ vent up a 2x4 wall, found after the walls were up.

Why we built it

The plumber sees the job before the pour.

Sound familiar?“how far apart do outlets need to be”
04

Under the slab

From below grade: drains falling at ¼″ per foot to the building drain and out to the sewer, risers into the walls, the water service below the frost line — the part that can't be changed after the concrete.

From below grade: the drains under the slab falling to the building drain, the risers up into the walls
The drains under the slab. Real screen · sample data.
Without it

Plumbing rough-in located from memory before the pour.

Why we built it

Get the part under the concrete right.

Sound familiar?“plumbing riser diagram”
05

Ducts in the attic

The Mechanical view draws the air handler, supply trunks and a branch to each room, the return over them, bath fans and the range hood ducted out, and the dryer duct with its length checked. Airflow is a stated rule of thumb — your HVAC contractor's Manual J sizes it.

The Mechanical view in the attic: the air handler, supply trunks and branches to each room, the return over them
The Mechanical view in the attic. Real screen · sample data.
Without it

Duct runs discovered to have nowhere to go.

Why we built it

The ducts have a place before the trusses go up.

Sound familiar?“where do the vents go in a barndo”
06

P1, the plumbing plan

The plan set gets P1 Plumbing plan: drains sized and tagged, cleanouts, vents, the drain exit with its depth, the water service and supply stubs.

Sheet P1, Plumbing plan: drains sized and tagged, cleanouts, vents, the drain exit with its depth and the water service
Sheet P1, Plumbing plan. Real screen · sample data.
Without it

The plumber priced from a floor plan with no pipes on it.

Why we built it

A sheet the plumber can work from.

Sound familiar?“HVAC duct layout barndominium”
07

P2, the riser diagram

P2 DWV riser diagram with the fixture schedule and every water line — the drawing a plumber expects.

Sheet P2, DWV riser diagram with the fixture schedule and every water line
Sheet P2, DWV riser diagram. Real screen · sample data.
Without it

Riser diagrams drawn by hand, or not at all.

Why we built it

What the inspector asks for, already drawn.

Sound familiar?“what to hand the plumber before the pour”
08

M2, ducts and gas

M2 Duct & gas layout: trunks and branches with their sizes, the airflow per room (labelled a rule of thumb), exhaust and dryer ducts with their length check, and gas pipe sizes when the plan burns gas.

Sheet M2, Duct and gas layout: trunks and branches with sizes, airflow per room as a stated rule of thumb, exhaust and dryer ducts
Sheet M2, Duct & gas layout. Real screen · sample data.
Without it

Mechanical left off the drawing set entirely.

Why we built it

The HVAC contractor starts from the house, not a blank page.

How it works
  1. 1Turn on Electrical, plumbing and mechanical views in Settings → Beta features.
  2. 2Draw the floor plan and place its electrical (Place code-minimum electrical does a room or the whole floor).
  3. 3In 3D open Layers and choose Electrical, Plumbing or Mechanical; read the legend for sizes and what to check.
  4. 4Open the Plan set for P1, P2 and M2 beside E1, or send them in a trade link.
Why we built it

Customers compare a turnkey barndo quote with kit prices that have no plumbing, electrical or interior at all. The trades are where the real house is — and where a layout nobody drew turns into a vent that won't fit a 2x4 wall, a bath 77 feet from the water heater, or outlets that were never on a circuit. Drawing the circuits, the pipes and the ducts from the floor plan, and flagging what a plumber or electrician would mark up, moves those discoveries from the rough-in to the drawing — where changing a line still costs almost nothing.

The problem
  • Outlets on the plan with nothing showing how they're wired
  • Plumbing nobody drew before the slab
  • Vents that won't fit the wall they're in
  • Long hot-water runs found after move-in
What you get
Every circuit from the panel, in its own colour
Independent 6′ receptacle spacing check
Drains sized by fixture units, at ¼″ per foot
Vents, cleanouts, PEX supply, water service and sewer trench
Ducts, returns, exhausts and the dryer duct check
P1, P2 and M2 sheets in the plan set
3D BUILDING DESIGNER

See electrical, plumbing and mechanical views, from the floor plan
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “barndominium plumbing layout” — we will show you exactly where that stops.