Building plans on the job

The building's drawings live on the job, downloadable from inside it — and they open by themselves for the crew.

The operating system built exclusively for post-frame and barndominium builders.

Part of Project Command
What it is

A Building Plans card in the project window listing the drawings for this build — assembly drawing, post layout, elevations, wall layout, cross-section, sheathing layout. Closed, the card says how many drawings there are and which SmartBuild job they come from — or No SmartBuild job linked. Each one generates and downloads on its own, so a drawing that fails says so on its own row. The card opens automatically on crew accounts and stays closed for the office. Built exclusively for post-frame and barndominium builders, so the drawings are post layouts, wall layouts and sheathing layouts.

Also called: drawings · plans on site · download the plan · SmartBuild outputs

See it, piece by piece
01

The drawings live on the job, not in a tool the crew can't log into

Assembly drawing, post layout, elevations, wall layout, cross-section, sheathing layout — generated and downloaded from inside the job. The crew needs the drawing, and it used to live in an estimating tool they had no login for, so plans got texted, printed, or read out over the phone. Sooner or later somebody frames off a revision that was superseded, and that mistake comes back down off the wall.

Building Plans
Building Plans6 drawingsSmartBuild job 41872
Assembly DrawingPost LayoutGenerating PDF...ElevationsWall LayoutCross-SectionSheathing Layout
Six drawings from SmartBuild job 41872, one of them generating. Real screen · sample data.
Without it

The crew builds from whatever drawing is in the truck, which may be two revisions old. Reprinting after every change never quite happens, and that is how the wrong opening ends up framed.

Why we built it

The crew lead opens the current drawing on his phone instead of trusting the one in the truck. Drawings that live on the job are the latest revision, so nobody frames off a superseded sheet and tears it back down.

02

Closed, the card already says whether the plans are there

Building Plans is one card among the project window's cards, and its closed tags answer the first question: 6 drawings · SmartBuild job 41872 — or, in amber, No SmartBuild job linked, which is the office's cue to pair it before the crew arrives.

Project window — every section a card
Open allClose all
WeatherToday: Gusts to 34 mph 1 PM–5 PMTomorrow: About 0.6 in of rain after 2 PM
Weather history2 days stopped1 hindered1 crew-reported30 days recorded
AssigneesDale WhitmoreMarla Renner
Plans & documents3 plansTruss plan — Hostetler.pdf · Rev 1Building permit.pdf
+ Add
Permits & inspectionsFraming · Thu, Aug 27, 9:00 AM1 approved
+ Permit+ Inspection
ScheduleJul 27 → Sep 641 daysDay 31 of 41
Building Plans6 drawingsSmartBuild job 41872
ContractFULLY EXECUTED
Billing$10,560.00 outstanding3 invoices3 change orders1 awaiting customer
Budget & marginMargin 13.3%Concrete over budget$35,840 not billed yet
Selections & allowances1 to approve+$640 vs allowances
Project phases3 of 6 doneNow: Siding / Roofing1 behind
ManageAdd Phase
Photos148 photos14 of 23 checkpoints photographed
Project chat2 unreadLevi: Last two posts set, starting girts after lunch11:42 AM
Tasks4 open1 overdueNext: Confirm steel delivery date
Labor & costsLabor $14,440 of $18,600Spent $60,230Margin 30%
Notes6 notesCustomer wants the 12×12 door moved to the east wall
The project window — Building Plans closed, with its drawing count. Real screen · sample data.
Without it

The crew arrives to a job with no drawings attached, and the office finds out when the phone rings at seven.

Why we built it

The project manager spots a job with no plans linked before the crew turns up to it. The amber tag turns a seven o'clock phone call on Monday into a two-minute fix on Friday.

Sound familiar?“crew can't get the drawings on site”
03

It opens by itself for the crew and stays folded for the office

For the office it is one card among a dozen. For a crew lead it is the reason he opened the job at all, on a phone, in a truck, at seven in the morning. The card opens automatically on crew accounts and stays closed on everyone else's.

Without it

A crew lead scrolls past a dozen office cards on a phone to find the one drawing he came for, gives up and calls.

Why we built it

The crew lead opened the job for the drawing, so it opens for him. He skips the hunt, and the office isn't buried in a card it rarely needs.

04

One drawing failing doesn't take the whole panel down

Each drawing generates and downloads on its own, and one that fails says Download failed — try again on its own row instead of blanking the card. He knows whether to wait or to phone the office.

Without it

One drawing fails, the whole panel goes blank, and the crew assumes there are no plans at all.

Why we built it

The man on site knows straight away which sheet to retry. One failed drawing never hides the other five, so the work doesn't stop for one bad download.

Sound familiar?“plans are in an email somewhere”
05

Pairing the job to its design takes a decision, and so does undoing it

The job finds its drawings through the direct pairing where one exists and falls back to matching by name where it doesn't, so drawings turn up on jobs that were paired long before anyone thought about it. Unhooking takes a confirmation and is limited to people allowed to manage plans — a crew lead cannot pull the drawings out from under the next crew.

Without it

Somebody unlinks the wrong job by accident and the crew opens plans for a different building.

Why we built it

The office can trust that the drawings on the job are this job's drawings. Only someone allowed to manage plans can unhook them, and only after a confirmation — so a crew lead can't pull the drawings out from under the next crew.

06

Your own files sit beside it: truss plans, blueprints, permits

Try it

The Plans & documents card takes the files that don't come out of the design — a truss plan, blueprints, engineering, a site plan, the permit — as PDFs, images or CAD files. Each is tagged by kind, and anyone on the account can open them in one tap — the crew sees only the newest version of each, on a phone. Closed, the card shows how many plans there are and the newest ones, with their revision.

Plans & documents
Plans & documents5 plansDawson Hoover - Engineering letter - truss uplift connections.pdfDawson Hoover - Truss Layout S-201 - Rev 1.pdf · Rev 1
+ Add

Truss plans, blueprints, engineering and permits for this build. Anyone on the account can open them — and the crew sees only the newest version of each, on a phone.

Dawson Hoover - Engineering letter - truss uplift connections.pdf
Engineering · 96 KB · Ridgeline office · Sep 29
New versionRemove
Dawson Hoover - Truss Layout S-201 - Rev 1.pdfRev 1
Truss plan · 1.2 MB · Ridgeline office · Sep 18 · Engineering change
What changed: Girder truss over the 14' door upsized to 3-ply
Seen by Nate Ottinger (Sep 18)
New versionRemove
Dawson Hoover - Building Permit BP-24-1187.pdf
Permit · 88 KB · Ridgeline office · Sep 2
New versionRemove
Dawson Hoover - Floor Plan A-101 - Rev 1.pdfRev 1
Blueprint · 640 KB · Ridgeline office · Aug 28 · Client change
What changed: Office moved to NE corner
New versionRemove
SupersededRev 0Dawson Hoover - Floor Plan A-101.pdfAug 21
Dawson Hoover - Site Plan C-001.pdf
Site plan · 310 KB · Ridgeline office · Aug 21
New versionRemove
Truss planAdd a filePDF, images or CAD · up to 100 MB
Mark set As-BuiltAt closeout: flags the current version of every plan as what was actually built.
Dawson Hoover's shop: engineering, truss layout, permit, floor plan and site plan, each tagged by kind. Real screen · sample data.
Without it

The truss plan is an attachment in the office manager's inbox, and the crew needs it on site right now.

Why we built it

The framer needs the truss plan the supplier sent, not just the drawings from the design. One place for both means nobody digs through email on site, and the permit is there when the inspector asks.

Sound familiar?“printed the wrong revision”
07

A new version never replaces the old one

Try it

In Plans & documents, New version adds the next revision with the reason it changed and keeps the old one, marked Superseded — the crew only ever sees the newest, and a revision can ask the crew lead to say he has seen it. Plan versions and As-Built is the whole story.

New version
New version of Dawson Hoover - Truss Layout S-201.pdf

This becomes Rev 1. Rev 0 is kept, marked Superseded — the crew only ever sees the newest.

The new file
Change fileDawson Hoover - Truss Layout S-201 - Rev 1.pdf
Why it changed
What changed (optional)
Girder truss over the 14’ door upsized to 3-ply
CancelUpload as Rev 1
The new truss layout becomes Rev 1 only once it has a reason; Rev 0 is kept. Real screen · sample data.
Without it

A revised truss plan went in over the old file, and the crew's link still had last month's.

Why we built it

The project manager revises a truss plan without wondering which copy the crew has — the field only ever gets the current one. The office keeps every old version for the day someone asks what changed.

08

At closeout, the final set is marked As-Built

Try it

When the building is finished, Mark set As-Built flags the current version of every plan on the job as the record of what was actually built — and the homeowner's House Book uses that set as the final plans.

Plans & documents — As-Built set
Emily Wenger — Riding Arena
Emily Wenger · 6101 Furnace Hill Rd, Seneca, KS · Completed
Plans & documents3 plansAs-Built setEmily Wenger - Truss Layout S-201 - Rev 2 (As-Built).pdf · Rev 2Emily Wenger - Floor Plan A-101 (As-Built).pdf
+ Add

Truss plans, blueprints, engineering and permits for this build. Anyone on the account can open them — and the crew sees only the newest version of each, on a phone.

Emily Wenger - Truss Layout S-201 - Rev 2 (As-Built).pdfRev 2As-Built
Truss plan · 1.4 MB · Ridgeline office · Aug 4 · Field condition
What changed: Truss T7 shifted 6" for the arena door header
New versionRemove
SupersededRev 1Emily Wenger - Truss Layout S-201 - Rev 1.pdfJul 23
SupersededRev 0Emily Wenger - Truss Layout S-201.pdfJul 10
Emily Wenger - Floor Plan A-101 (As-Built).pdfAs-Built
Blueprint · 520 KB · Ridgeline office · Jul 13
New versionRemove
Emily Wenger - Site Plan C-001.pdfAs-Built
Site plan · 290 KB · Ridgeline office · Jul 13
New versionRemove
Truss planAdd a filePDF, images or CAD · up to 100 MB
As-Built set marked3 plans are the as-built record of this job.
Emily Wenger's riding arena, every plan tagged As-Built. Real screen · sample data.
Without it

The homeowner asked for the final plans and got the permit set, two revisions old.

Why we built it

The owner hands over drawings that match the building, and the warranty call years later starts from the right truss plan. That is the record a homeowner expects a good builder to keep.

How it works
  1. 1Open the job and find the Building Plans card — its tags already say how many drawings there are.
  2. 2Pick the drawing you need and download it.
  3. 3On a crew account the card is already open.
  4. 4A drawing that fails says so on its own row.
  5. 5Unhooking the drawings takes a confirmation and a permission.
  6. 6Files you add yourself — truss plans, blueprints, permits — go in the Plans & documents card.
  7. 7In Plans & documents, New version keeps the old file marked Superseded, and Mark set As-Built flags the final set at closeout.
Why we built it

The crew on site needs the drawing, and the drawing lived in an estimating tool crews have no logins for — so plans got texted, printed or read out over the phone, and eventually somebody built off a revision that had been superseded. The section opens automatically for crew accounts, because for the office it is one panel among many and for a crew lead it is the reason he opened the job at all.

The problem
  • Drawings trapped in the estimating tool
  • Crews working from stale printouts
What you get
Current plans reachable from the job itself
Crew sees them first, without hunting
The closed card warns when no plans are linked
PROJECT WORKSPACE

See building plans on the job
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “crew can't get the drawings on site” — we will show you exactly where that stops.

leads2build.com
Laminated columns standing in a post-frame shell
Building Plans
Building Plans6 drawingsSmartBuild job 41872
Assembly DrawingPost LayoutGenerating PDF...ElevationsWall LayoutCross-SectionSheathing Layout
Building plans on the job — Leads2Build