Barndominium trades

Every trade on a barndominium job in one place — who does it, the price you agreed, the stages it covers and when they're on site.

The operating system built exclusively for post-frame and barndominium builders.

Part of The Trade Network
What it is

A Trades section on each barndominium project. Each trade — dirt work, utilities, septic, plumbing, electrical, HVAC, spray foam, drywall, cabinets — is a row showing who provides it (your own in-house trade division, an outside sub, or your own crew), where it stands, its price, the schedule stages it covers, the next visit and any jobs linked from another system. Open a trade to ask your division for a bid, accept it, revise it, and schedule its visits.

Also called: trade packages · trades tab · in-house division bid · internal subcontract · agreed price · hvac division · trade visits · work orders

See it, piece by piece
01

Every trade on one card

Try it

A barndominium project gets a Trades section: dirt work, septic, HVAC, plumbing, electrical, spray foam, drywall, cabinets — one row each. A row says who does it (your in-house division, an outside sub or your own crew), where it stands, the price with a lock once it's accepted, the stages it covers, the next visit and how many jobs are linked from another app. The header counts it up: 3 of 8 accepted · 1 bid to review · 1 waiting on a bid · $25,067 agreed.

Project window — Trades, Tyler & Kara Brooks 40×60 barndominium
Add trades
Tap a trade to open it — the septic bid, the locked HVAC price, the plumbing sub's change order. Real screen · sample data.
Without it

Halfway through a barndo, nobody could say which trades were priced and which were still a guess.

Why we built it

The PM sees which trades are priced and which are still a question mark without ringing round.

Sound familiar?“our HVAC guys are in-house but we still have to track what they charge the job”
02

Your own division bids the work

Try it

Ask the division for a bid and its managers hear about it. They enter their own cost and target margin, and the bid is cost ÷ (1 − margin) — $9,800 at 22% is $12,564.10. The division's cost and margin stay with the division; the builder sees the price, the note and Accept. How the money then counts on the job is on internal division commitments.

Trade — Septic, the division's bid
Trade

Septic — Aerobic septic system

Bid inMechanical & Dirt26-BROOKS-001

Who does it

Price

$12,564.10bid from Mechanical & Dirt (Nate O.), 10/6/2026

“Includes the county permit and the 2-year service contract.”

Mechanical & Dirt's bid— your cost and margin stay with your division.
Your cost
Margin %
Bid
$12,564.10
Void this tradeDone
Change the cost or the margin and the bid follows; Accept locks it. Real screen · sample data.
Without it

The in-house septic price was a phone call and a sticky note, and nobody could say how it was worked out.

Why we built it

A firm internal price, worked out the same way every time, beats a number passed across the shop floor.

Sound familiar?“the division went over and suddenly my job cost changed”
03

Accepted means locked

Try it

Once a price is accepted it becomes the job's cost for that trade and shows with a lock. The HVAC division's $6,666.67 stays $6,666.67 if its crew runs over — that comes out of the division's margin, not the job's budget. The same window holds the trade's visits, its scope, the stages it covers and any jobs linked from the division's own app.

Trade — HVAC, 4-ton heat pump, ducted, with ERV
Trade

HVAC — 4-ton heat pump, ducted, with ERV

AcceptedMechanical & Dirt26-BROOKS-001

Who does it

Mechanical & Dirt · locked with the accepted price

Price

$6,666.67agreed 9/29/2026

Visits

  • Site visitTue, Oct 13, 2:00 PMNate O.Walk the shell with the framer — chase locations
  • Rough-inMon, Oct 26, 1:00 PMNate O., Bess K.Air handler in the mech closet
  • Trim-outMon, Nov 23, 1:00 PMBess K.
  • Start-upTue, Nov 24, 2:00 PMNate O.

Scope

4-ton heat pump with air handler, ducted to 6 rooms, ERV for fresh air, rough-in, trim and start-up.

Stages it covers

Linked jobs in other systems

  • WorkizWZ-47930Load calc & equipment orderDone
  • WorkizWZ-48211HVAC rough-inScheduled
Void this tradeDone
The locked price sits above the visits, the scope, the stages and the linked jobs. Real screen · sample data.
Without it

The division ran over on the ductwork and the job's budget quietly went up with it.

Why we built it

The builder budgets a number that doesn't move behind their back.

Sound familiar?“nobody knows when the plumber is actually coming”
04

Only a revision moves it

Try it

Revise price asks whether it's a Change order (the scope changed) or a Correction (the price was wrong), the new price and why. The difference works itself out and each revision is listed under the price with its date and reason — the plumbing sub's +$650 for a water softener loop sits there for anyone to read. A customer-facing extra still goes through change orders.

Trade — Plumbing, Revise price
Trade

Plumbing — Under-slab, rough & finish plumbing

AcceptedValley Plumbing & Drain26-BROOKS-001

Who does it

Valley Plumbing & Drain · locked with the accepted price

Price

$10,650.00agreed 9/26/2026
New price
Change
+$250.00
Why
  • Change order+$650.00 → $10,650.0010/3/2026 · Water softener loop added (customer request)
Void this tradeDone
Approve the second water heater: the price moves to $10,900 and the history gains a line. Real screen · sample data.
Without it

A trade's price had changed twice and nobody could say why, or who had said yes.

Why we built it

Every change to an agreed price has a reason and a date beside it, so nobody argues about it at the end of the job.

Sound familiar?“every trade is on a different spreadsheet”
05

Build mode is per project

Try it

A builder who does pole barns and barndominiums sets Build mode on each job. Trades appears on a barndominium; a post-frame shop looks exactly as it always has. Switching asks first, says the schedule stays exactly as it is, and keeps any trades already set up for if you switch back.

Project window — Build mode
Tyler & Kara Brooks — 40×60 Barndominium26-BROOKS-001 · Coweta, OK
Build mode

Homes in a post-frame or steel shell: adds the Trades tab (HVAC, plumbing, electrical, septic, dirt work…), barndo stages and residential code checks.

Trades · 3 of 8 accepted · 1 bid to review · $25,067 agreed
Switch to Post-frame: the confirm says the schedule stays; Trades goes away and comes back. Real screen · sample data.
Without it

Barndo screens cluttered every shop job, or the houses went without them.

Why we built it

Each job shows the tools for what it is, and a wrong pick costs nothing to fix.

How it works
  1. 1On a new barndominium job, Set up creates the build mode's trades in one press: trades your division does go to it, the rest start as outside subs, and the stages each covers are suggested from the schedule.
  2. 2Ask the division for a bid and its managers are notified. They enter their own cost and target margin; the bid is cost ÷ (1 − margin), and their cost stays with their division.
  3. 3Accept locks the price: it becomes the job's cost for that trade. From then on only a revision — a change order or a correction, with a reason — moves it, recorded with who approved it.
  4. 4Visits (site visit, rough-in, trim-out, start-up, service call, inspection) are the trade's work orders; each one lands on the company calendar for the people on it.
  5. 5Post-frame projects are untouched: the section only appears on barndominium projects of an account that offers that build mode.
Why we built it

A barndominium builder with an in-house HVAC or dirt-work division has two problems ordinary job costing can't hold. The division's work is a real cost to the job, but it is one company, so it must not become a fake bill or sale in the books. And the builder needs a firm number: if the division runs over its own estimate, that is the division's problem, not a change to the job's budget. So the agreed price locks on acceptance and moves only through an approved revision with a reason. Visits live on the same record so the division can run its field schedule here instead of in a separate app.

The problem
  • In-house trade work had no agreed price on the job, so job cost moved whenever the division's costs did.
  • Trades, their prices and their site visits lived in separate tools.
  • Changing an agreed price left no record of why or who approved it.
What you get
One row per trade with its provider, price, stages and next visit.
A locked price that only an approved, explained revision can change.
The division prices its own work; its cost and margin stay its own.
Trade visits appear on the company calendar for the people on them.
PROJECT WINDOW

See barndominium trades
on one of your own jobs.

Thirty minutes with Keith — your building, your numbers. Bring the job where “our HVAC guys are in-house but we still have to track what they charge the job” — we will show you exactly where that stops.

leads2build.com
Windows set into a finished wall
Project window — Trades, Tyler & Kara Brooks 40×60 barndominium
Add trades
Barndominium trades — Leads2Build