The Shop Is Priced in SmartBuild. The Draws Are Not.

SEPTEMBER 9, 2026 · KEITH LEMAY
A 40x60 post-frame shop mid-build beside its draw invoices — where the SmartBuild estimate has to go after the number exists

SmartBuild estimating will price a 40x60 shop with a 12-foot lean-to before your coffee gets cold, and that is not where the money leaks. The leak is in the ninety days after the number exists — the proposal retyped from the take-off, the eave height that changes after contract, the draw schedule nobody updated, the final invoice that does not match the signed total.

What is SmartBuild genuinely good at?

It is a parametric building engine, and a very good one. Describe the building — 40 wide, 60 long, 14-foot eave, 4/12 pitch, columns at 8 feet on center, a 12x60 lean-to down one eave — and it derives the components from the geometry. Raise the eave to 16 feet and you are not editing cells: the columns get longer, a girt row appears, the panels and trim change with them. The output is real parts in the sizes a supplier stocks, which is why lumberyards and post-frame dealers run it, and the customer can see the building.

If you are still choosing rather than committed, the honest fit guide to pole barn estimating software is separate. The problem is not SmartBuild. A priced model is the front end of the job, not the whole of it.

What still has to happen after the number exists?

Priced in SmartBuildDecided after SmartBuild
Column size, spacing, embedmentWho signs, and when the price expires
Truss span, spacing, load caseDeposit amount, and whether it cleared
Panel lengths, trim, fastenersWhat a mid-job upgrade does to the contract total
Material cost and sell priceWhat gets billed at each draw, and what is left

Every row on the right decides whether the margin on the left survives. A 40x60 priced at a healthy number still finishes flat when the 16-foot wall upgrade never reaches an invoice, or when a signed job sits three weeks before steel is ordered. Post-frame is unusually exposed — the National Frame Building Association exists partly because one dimension change ripples through the whole structure. SmartBuild handles that ripple inside the model; it falls apart the moment the number leaves.

Where does the same number get typed a second time?

The proposal: scope and price into a Word template. The contract: the total again, with a draw schedule built by hand. The deposit invoice: the total again, in QuickBooks. The materials order: the take-off again. The change order: the delta priced in SmartBuild, retyped into a change form, into the customer's email, and — if you remember — into the invoice. The final bill: reconstructed from four documents that do not agree.

Illustrative hours, replace with your own: four retypes at 20 minutes is 80 minutes a job; forty signed jobs a year is about 53 hours, mostly at night. The hours are the cheap part. Say you sell the 40x60 at 14-foot walls and in week two the customer wants 16 feet for a hoist. You re-run SmartBuild in ten minutes and the take-off is right; say the upgrade adds $6,800. The proposal is updated, the amendment signed — but the draw schedule in QuickBooks was set at contract, so the $6,800 rides silently into the final draw, and you are asking for a bigger last cheque in the last week of the job, when you have the least negotiating room you will ever have. That argument costs more than the 53 hours. The change order that protects your margin is the paperwork; a change order that adjusts the remaining stages the moment it is approved is the mechanism.

Change Order — Billing & Delivery
Billing & Delivery$ Amount% of total
1
Doors — deposit at order
$2480.00×
Separate invoice= $2480.00
2
Door install labor
$3200.00×
Merge into existing paymentINV-2026-0038 · Delivery — $35,380.00= $3200.00
3
Balance on completion
$3802.35×
New scheduled payment= $3802.35
+ Add paymentAllocated $9482.35 of $9482.35

Merging into a payment that’s already been sent or paid will automatically append it as a new scheduled payment instead — a billed invoice is never re-charged.

The $6,800 wall upgrade rides on the next draw or bills on its own — the stages already billed stay put, the remaining ones move Real screen · sample data.

What must "integrates with SmartBuild" actually mean?

Five tests; a system passes them or it is a filing cabinet with an import button.

  1. The estimate arrives as line items, not a PDF. Nothing downstream can compute from an attached document, so you still retype.
  2. It lands on the right customer automatically. Estimate, contact and job are one identity; a step that needs someone to search "Hendricks" and drag the estimate onto him gets skipped on a busy Friday.
  3. A revision updates the job instead of forking it. Re-run at 16-foot walls and you want version two of the same estimate, version one still readable, the current total updated everywhere. Estimate version history keeps every revision, with one live and the customer's link always showing that one.
Versions — Compare
Versions
Hoover 40 × 60 Equipment Storage
Done
Version 3Version 4DifferenceChange
v3: $88,926.47v4: $93,348.50
+$4,422.03
more · customer total
Materials$49,360.22$49,808.75+$448.53
Services$21,846.00$25,546.00+$3,700.00
Markup$8,809.72$9,083.22+$273.50
Line items changed
Doors & Windows$8,329.47$9,640.00+$1,310.53
Wainscot Panelsgone$862.00$862.00
Version 4Latest
Aug 24, 2026 2:14 PM · Dale Whitmore
$93,348.50
customer total
Version 3LiveSent
Aug 21, 2026 9:02 AM · Dale Whitmore
$88,926.47
customer total
v2
Version 2SentFirst sent
Aug 12, 2026 4:37 PM · Marcus Feld
$84,110.00
customer total
The live number follows the price book while you draw and stops when the estimate is dated — a revision is a new version, not a second estimate Real screen · sample data.
  1. Signature triggers the next thing. The moment the customer signs, the deposit invoice exists, the job is on the schedule, and the material order is in front of whoever cuts POs. Contracts that write themselves from the estimate assemble the agreement from the approved lines and the customer's own details, so nothing is retyped and nothing can drift.
Construction Agreement
Construction Agreement
Review the agreement, then sign at the bottom. Use Print / Save PDF at the top to download a copy anytime.
Leads2Build Construction
Project Agreement · Effective August 26, 2026

Leads2Build Construction — Construction Agreement

This Agreement is entered into on August 26, 2026 between Marla Zimmerman (“Client”) and Leads2Build Construction (“Builder”).

Project Address: 4180 Sawmill Road, Ashland, MO 65010


Part 1 — Estimate & Specifications

ItemAmount
Post-Frame Structure Package$38,420.00
Roofing & Trim$9,865.00
Doors & Windows$6,240.00
Concrete Slab & Footings$12,180.00

Subtotal: $66,705.00
Tax: $4,450.00
Total: $71,155.00

Payment Schedule

  • Deposit at signing: 30% — $21,346.50
  • Material release: 40% — $28,462.00
  • Substantial completion: 30% — $21,346.50
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MECHANIC’S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR “LIEN WAIVERS” FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT.
In the event payment is not made when due, if the default is not cured within 10 days of the due date, then the payment shall bear interest at the rate of 10% per annum from the payment due date until paid.

Part 2 — Client Waiver and Agreement

By applying your initials to each section, you acknowledge that you have read, understood, and accepted the related terms.

1. Materials

We use high-quality materials; however, natural characteristics of wood and concrete may include splits, knots, cracks, warping, mold, or discoloration. These are normal and do not indicate defects. Metal trim, siding, and roofing are handled manually and may show scratches, dings, oil-canning, cutting marks or gaps.

Initialed:

2. Site Preparation

The project site must be level within two (2) inches unless otherwise agreed upon in writing. All obstructions must be removed within twenty (20) feet of all sides of the new structure before construction begins.

Initial:Tap to initial
Legal name, build site, the approved total, the line items and the dates assembled from the estimate — not typed into a template that evening Real screen · sample data.
  1. Billing derives from the estimate. A draw is a share of contract lines, not a number somebody remembers; when the total changes, every remaining draw changes with it.

How does one estimate run through to the draws?

The lead lands on a card with the name, the site address and what they asked for. You build the 40x60 with the lean-to in SmartBuild, where you should. The priced estimate comes across onto the customer's card as line items under the same job name, so nothing is renamed or orphaned. The proposal builds from those lines with your terms and an expiry; the customer signs on their phone; signing creates the deposit invoice, drops the build onto the schedule and opens the job. When the 16-foot upgrade comes in, the revision lands as a change order against the same job, the contract total moves, and the remaining draws move with it — so the $14,000 draw in week six is the right $14,000. Invoicing builds each draw from the estimate and the payment schedule the customer already agreed to, and the final invoice reconciles against the signed total because it was never typed twice.

New Invoice — payment schedule
Estimate (Job #41208)Locked to this projectHide ▴
Generate 4 invoices from payment schedule
One draft per stage, each with its $ amount pre-filled. Edit + send each separately.
Generate 4
Or pull modular pieces into a single invoice manually:
+ Materials $41,850.00+ Labor $27,300.00+ Markup $8,140.00+ Customer Total $88,450.00
Payment Schedule (select stages to invoice)+ Insert 1 Stage
Down30%$26,535.00
Delivery40%$35,380.00
Frame Complete20%$17,690.00
Final10%$8,845.00
The deposit, the delivery draw and the final are already on the job — each one becomes an invoice when it is earned Real screen · sample data.

That is the Live Estimate System: you keep the estimating engine you trust and stop being the integration between it and everything else.

Before anything else today, count the separate documents carrying the contract total on your last three signed jobs — more than two is drift waiting to happen — and check whether your most recent change order is in the remaining draw schedule or riding into the last invoice.

Where does this stop working?

Integration propagates numbers; it does not check them. A labour rate two seasons stale moves the wrong number faster and further, with your signature under it — the pricing side is separate work and still yours. And supplier price holds: your material quote and your proposal each carry an expiry, and the two dates almost never match. The best we do today is keep both visible and remind you before either lapses; re-pricing a live proposal against a moving supplier book is a hard problem, and it is not finished.

LEAD · QUOTE · SIGN · INVOICE · BUILD

Build the business,
not just the buildings.

One system from the first call to the final invoice — pipeline, 3D estimates your customer can see, e-sign, deposits, scheduling, change orders and a branded portal.

leads2build.com
A post-frame barndominium at dusk, warm light in every window