The build-side half of Team. A verdict card per crew — Ahead of plan, On plan, Running late — with average days versus plan and a proportional reliability rule. Clicking a card scopes every panel below it. Then a schedule-reliability mix, a diverging bar of days off plan by stage around a zero line, a ranked chart of where lost days went, and a monthly variance trend.
Also called: crew analytics · which crew runs late · crew schedule performance · days off plan · which crew is behind · crew reliability · crew comparison
- 1Only completed stages with a recorded variance are counted.
- 2Per crew: early / on time / late counts, average variance, total days lost, reliability percentage and the single worst slip with its project, stage and recorded reason.
- 3Cards are sorted worst-first so the crew needing attention is read, not found.
- 4Selecting a crew filters every chart below and pins an explicit banner stating the scope.
- 5Days off plan is plotted per stage per crew, coloured by crew and centred on a zero reference line.
'when you look at stage completion per crew, it's hard to understand the analytics and the insights that come from it.' The file lists the three specific defects: names clipped to 16 units so two crews read identically; a bar scaled as avgDays ÷ (plannedAvg × 2), 'a scale with no meaning'; and worst, 'It plotted DURATION, which is dominated by how big the stage is. Framing takes longer than dirt work on every crew, so the longest bars just marked the biggest stages, not the slowest crews.' The fix is stated as a principle: 'Plot VARIANCE AGAINST PLAN, not duration. That single change makes zero the meaningful centre, puts every stage on one comparable scale, and makes "who is behind" the thing you see first instead of the thing you compute.'
- Duration charts ranked stages by size, not crews by performance.
- There was no drawn reference for 'on plan', so being off plan could not be read off the chart.
- Crew names were truncated to the point of being indistinguishable.
See it on your own jobs
Twenty minutes, your numbers, no slide deck. We’ll build one of your real buildings in front of you and send you the estimate link at the end — yours to keep either way.