Two explicit modes: 'Shift Entire Timeline' keeps the job the same length and moves the start with it; 'Adjust Final Stage' keeps the start where it is and lengthens or shortens the last stage. The description above the picker changes with the selected mode.
Also called: shift entire timeline · adjust final stage · change the finish date
- 1Mode toggle sets endDateShiftMode; the copy under it restates the consequence in the builder's terms
- 2Shift mode applies the delta to every task's startDay; adjust mode changes only the final stage's duration
- 3Both paths save the project and re-sync phases
There are two ways to change an end date and they do opposite things to the start: one holds the start and stretches the job, the other slides the whole thing forward. They were previously distinguishable only by their names. A builder picked the wrong one, watched his start date fly back to May, and reasonably concluded he was doing something wrong. Each option now states what it will do to the other end of the job before it does it.
- Two very different operations hidden behind similar-sounding labels