Posts in the ground, drawn and priced

Every embedded post is drawn one piece into the ground, on a concrete footing pad, cast inside a full-depth poured collar — and all three are on the order.

What it is

Foundation geometry and rules derived from ANSI/ASAE/NFBA EP486.3, USDA/NRCS PA-12 and the NFBA design manual: a prescriptive 40in embedment floor, an 8ft auger ceiling, an 18in-diameter by 6in footing pad, 2000 psf presumptive bearing, and a per-site frost depth field defaulting to a central-US 3ft.

Also called: post embedment · footing pad · concrete collar · frost depth · uplift anchorage

See it
Posts in the ground, drawn and priced
CustomerBuildingAmountStatus
Ronan Petsch30×40 Garage$5,570Open
Marlin HooverHobby Shop$10,700Open
Sutter KlineRiding Arena$5,950Draft
Sutter KlineHobby Shop$4,620Draft
Ivy BrubakerRiding Arena$4,050Sent
Foundation layer: translucent ground, treated posts descending into cylindrical concrete collars sitting on round footing pads. Sample data — no customer information appears here.
How it works
  1. 1Each embedded member's drawn box extends below grade by postEmbedment; its cutLength already counted it.
  2. 2A footing pad lands under each post and a concrete backfill collar is drawn around it, visible in the foundation layer where the ground renders translucent.
  3. 3The pass runs AFTER additions merge, so lean-to and porch columns get the same treatment for free.
  4. 4Interior columns (a monitor's raised-centre lines) get the same poured collar — skipping them left bare wood in the hole while every wall post sat in concrete.
  5. 5The takeoff emits post-hole concrete in cubic yards, footing pads each, and an uplift-restraint line per hole.
  6. 6Validations flag embedment below the prescriptive floor and a footing that does not bear below the site's frost depth.
Why we built it

Post-frame buildings carry lateral and uplift load through the soil — the concrete around the post is the restraint — and none of it is visible once the dirt goes back, which is why it gets argued about after the fact and left off orders. Below grade is drawn: the hole, the footing pad, and the treated post cast inside its poured collar at the embedment the design specifies. A builder can point at exactly what the concrete line on the quote is paying for.

The problem
  • Concrete quantities guessed per hole.
  • Foundation work invisible in the model and therefore missing from the price.
  • Embedment set below the prescriptive minimum without anyone noticing.
Sound familiar?
What you get
Post-hole concrete, footing pads and uplift restraint all land on the order.
Frost depth is a per-site field, not a hard-coded assumption.
The foundation layer shows the customer what they are paying for.

See it on your own jobs

Twenty minutes, your numbers, no slide deck. We’ll build one of your real buildings in front of you and send you the estimate link at the end — yours to keep either way.

or keep browsing features →