Crew schedule table

Crews ranked by average variance against baseline, with stages completed of started, on-time rate and total days over.

What it is

The tabular companion to the Field Performance charts, inside settings. Sorted best variance first. Stages read as completed/started so the sample is on screen. An (i) on the heading tells the reader to check the run count before drawing a conclusion. Work with no crew assigned gets its own row rather than being dropped.

Also called: crew on-time rate · which crew is behind · crew days over

See it
Crew schedule table
Apr
May
Jun
Jul
Ivy Brubaker — Hobby Shop
Framing
Ivy Brubaker — Hobby Shop
Concrete
Ivy Brubaker — Riding Arena
Trim
Marlin Hoover — Hobby Shop
Framing
Marlin Hoover — Hobby Shop
Concrete
Framing crewConcrete crewTrim crew
The 'Crews' table: Crew / Stages (12/17) / On time 71% / Avg variance +1.4d / Days over 9d. StageAnalyticsTab.tsx. Sample data — no customer information appears here.
How it works
  1. 1Stage logs are grouped by crew; only rows with a variance count toward the averages.
  2. 2On-time rate = stages with variance at or below zero ÷ completed stages.
  3. 3Days over sums only the positive variances.
  4. 4Crews with no stages in the window are filtered out.
Why we built it

The heading's (i): 'Ranked by average variance against baseline. Read the run count first — a crew with two stages behind it is an anecdote, not a trend.' Keeping the unassigned bucket visible matters because unassigned work is itself a scheduling finding.

The problem
  • Crew comparison required reading the Gantt job by job.
  • Unassigned stage work disappeared from every rollup.
Sound familiar?
What you get
On-time reliability per crew in one sortable table.
Unassigned work is visible as its own line rather than silently excluded.