A row of segments across the branded dark header, with phase names beneath their own segment. Segments are flex-weighted by milestone count so a twelve-step phase reads as a longer stretch of the build than a three-step one. The phase currently underway carries a soft glow. Completed segments are green, delayed ones red, and progress on the dark band is drawn in near-white.
Also called: progress bar for the customer · how far along is my build · phase bar
- 1Each phase's completed and total milestone counts come from the resolved checkpoint list
- 2Segment flex weight is the phase's milestone total
- 3Fill colour is chosen by phase status and completion percentage
- 4The identical bar lower on the page keeps the standard accent tokens because it sits on a light card
A single gradient bar said 62% and nothing about where the build actually was. Segments per phase answer the question a customer watching their building actually has — framing is half done, siding has not started — at a glance. The fill is deliberately not the builder's accent colour: on a dark brand the bar sits on a band derived from that same colour and vanishes, navy on navy, which is true of most builders' brand colours. The status colours were measured rather than eyeballed, since the usual green and red came in at 2.85:1 and 2.59:1 against the band, under the 3:1 minimum for non-text graphics, so lighter variants that clear it against navy, near-black, evergreen, slate and bronze were substituted.
- A single percentage that does not say where the build is
- Brand-derived accents becoming invisible on brand-derived backgrounds
- Status colours failing contrast on dark brand bands
See it on your own jobs
Twenty minutes, your numbers, no slide deck. We’ll build one of your real buildings in front of you and send you the estimate link at the end — yours to keep either way.
or keep browsing features →