A one-click repair that keeps every stage's own duration and only changes where it sits. Starts land on working days, so a reflowed schedule never opens a stage on a day the crew doesn't work. The button label previews the resulting start date, end date and length.
Also called: fix my schedule · reflow stages · reset the timeline
- 1reflowInOrder walks the tasks in plan order from an anchor day, placing each at the next working day after the previous one ends
- 2Gaps are deliberately squashed — 'once the order is broken there is no way to tell a deliberate wait from an accident'
- 3spanOf() computes the preview range shown on the button before the builder commits
- 4The result is saved through the same dynamic-project save + phase sync as any other schedule edit
Once a schedule has been scrambled by one bad date, the plan that was originally intended is simply gone — there is nothing to restore it from. Rebuilding the stages back to back from a start date the builder picks is the one repair that is honest about being a repair, and the resulting dates and total length are shown before anyone commits to them.
- Manually re-dating every stage after one bad entry