A Resync control on the estimate sidecar that re-runs the same resolution chain — approved snapshot, signed contract, live sources — and refreshes the totals, material sections and stage list on the open invoice.
Also called: estimate changed · refresh the numbers · re-pull the estimate
- 1Resync calls loadEstimateForLink or loadEstimateForJob depending on which engine the source came from.
- 2Stage selections reset to all stages; section selections clear.
- 3The binding itself is untouched, so this is not an override.
Estimates get revised and re-approved while a job is running, and an invoice editor left open kept showing whatever it read when it was first opened. A resync re-pulls the current estimate and updates the attached snapshot, so a builder billing after a revision is billing the revision and not last week's numbers.
- A stale estimate snapshot on an open invoice after a revision.
See it on your own jobs
Twenty minutes, your numbers, no slide deck. We’ll build one of your real buildings in front of you and send you the estimate link at the end — yours to keep either way.
or keep browsing features →