An amber banner in the estimate sidecar, shown only when the signed total and the current estimate total differ by a cent or more. It states the signed amount, the current estimate amount, and the gap, and says the invoice will stay on the signed figure until a change order covers the difference.
Also called: estimate changed after contract · scope crept · difference between estimate and contract · unbilled extras
- 1Both totals travel on the estimate source: signedTotal from the contract, estimateTotal from the approved link.
- 2The banner renders when both exist and differ by at least $0.01.
- 3The insert buttons continue to use the signed total — the gap is never silently added.
When the live estimate and the signed contract disagree, both silent options are wrong: bill the newer number and the customer is charged for scope they never agreed to; bill the old one quietly and the builder never learns that work has been added with no change order behind it. The gap is shown instead — both figures and the difference between them — so somebody decides whether it is an error or an extra that needs paperwork.
- Work added after signing being either billed without agreement or never billed at all.
- A builder unaware their own estimate had changed.